会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 7. 发明授权
    • Method of installing pin piles into a seabed
    • 将桩桩安装在海床上的方法
    • US09587766B2
    • 2017-03-07
    • US14786314
    • 2014-04-11
    • TECHNIP FRANCE
    • John OliphantAbiola OjoAlasdair Maconochie
    • E02D7/00F16L1/16F16L1/20E02D5/54E02D7/08E02D7/14
    • F16L1/201E02D5/54E02D7/00E02D7/08E02D7/14F16L1/16
    • A method of installing a plurality of pin piles into a seabed including at least the steps of: (a) lowering a pin pile apparatus comprising a first pin pile and an attached clump weight towards the seabed; (b) allowing the first pin pile to self-penetrate the seabed based on self-weight of the pin pile apparatus and the momentum from step (a) until the clump weight reaches the sea bed; (c) disconnecting the clump weight from the first pin pile; and (d) recovering the clump weight for use with a second pin pile and repeating steps (a)-(c). In this way, the pin piles are easily installed from their descent to the seabed with the clump weight, which can then be removed and applied to the next pin pile in an easy and repeatable operation without requiring a suction apparatus or hammer or drill.
    • 一种将多个销桩安装在海床中的方法,至少包括以下步骤:(a)将包括第一针桩和附着的重量的针桩装置降低到海底; (b)允许第一针桩基于针桩装置的自重自重穿透海床,并且从步骤(a)到达重量达到海床的动量; (c)从第一针桩断开团块重量; 和(d)回收与第二针桩一起使用的重量,并重复步骤(a) - (c)。 以这种方式,销桩很容易从下沉到海床,并且可以以简单且可重复的操作将其卸下并施加到下一个针桩上,而不需要抽吸装置或锤子或钻头。
    • 9. 发明申请
    • HYDRAULIC BREAKER HAMMER CASING ASSEMBLY FOR PILE DRIVING
    • 液压断路器锤子组件驱动
    • US20140262393A1
    • 2014-09-18
    • US13795709
    • 2013-03-12
    • Alain Desmeules
    • Alain Desmeules
    • E02D7/14E02D13/04E02D7/10
    • E02D7/06
    • A hydraulic breaker hammer casing assembly for converting a hydraulic breaker hammer to a pile driving apparatus for driving piles into the ground. A hydraulic breaker hammer is immovably retained in a support housing. The hydraulic breaker hammer is fitted with a blunt working implement for transmitting blows to a drive cap supported on top of a pile. A pile guiding assembly is secured at an open bottom end of the support housing for guiding, in axial alignment with the working implement, the pile being driven in the ground. The casing assembly protects the hydraulic breaker hammer secured therein and provides access thereto as well as displaceable connection to a boom of a pile driving rig.
    • 一种用于将液压破碎锤转换成用于将桩驱入地面的打桩装置的液压破碎锤壳体组件。 液压破碎锤不可移动地保持在支撑壳体中。 液压破碎锤配有钝化工作器具,用于将冲击传送到支撑在桩顶上的驱动帽上。 桩引导组件固定在支撑壳体的敞开的底端处,用于与工作工具轴向对准,以便在地面上驱动桩。 壳体组件保护固定在其中的液压破碎锤,并且提供对其的通路以及可移动地连接到打桩机的起重臂。
    • 10. 发明申请
    • ADJUSTABLE RAKED PILE DRIVER USING THE PUSH PULL METHOD
    • 使用推拉方式可调节拉力驱动器
    • US20140193210A1
    • 2014-07-10
    • US14240272
    • 2012-06-14
    • Chin Chai Ong
    • Chin Chai Ong
    • E02D7/20E02D11/00E02D7/14
    • E02D7/20E02D7/14E02D11/00
    • A pile driver assembly consisting of a plurality of pile driver units interconnected together to a rigid base frame that uses the push and pull method to drive a group of raked piles. The pile driver units progressively push one pile at a time for a short distance into the ground while being pull down by the rest of the stationary driven piles in a repeated cyclical driving sequence until the required pile driving force is reached for every pile in the group. The pile driver assembly consists a plurality of interconnected pile driver units, a pile driver base adaptor, a pile clamping system and strong base frame to drive the piles in a two dimensional array of variously raked pile group from 1V:1H to true vertical in the z-axis and rotated to any angle in the x-y plane at a minimum pile's spacing of three times the pile's diameter.
    • 打桩机组件由多个打桩机单元组成,该单元互相连接在一起,使用推拉方式驱动一组倾斜桩的刚性基座。 打桩机单元逐渐地将一堆桩一次推入地面,同时以重复的周期性驱动顺序被其余的静止驱动桩下拉,直到达到组中每桩的所需的打桩力 。 打桩机组件包括多个互连的打桩机单元,打桩机底座适配器,桩夹紧系统和坚固的底座,用于以1V:1H到真垂直的两维阵列驱动桩, z轴旋转至xy平面中的任意角度,桩的最小距离为桩的直径的三倍。