会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明申请
    • CONSTRUCTIVE SYSTEM AND METHOD OF CONSTRUCTION THEREOF
    • 建筑系统及其构造方法
    • US20160319541A1
    • 2016-11-03
    • US14702359
    • 2015-05-01
    • Elastic Potential, S.L.
    • Marc Sanabra
    • E04B5/02E04C5/08E04C2/06E04B5/04E04B5/17
    • E04C5/08E04B5/043E04B5/06E04B5/19E04B5/265E04B5/48E04B2103/02E04C3/26
    • Constructive system comprising at least four modular elongated prefabricated floor elements, each floor element defining a longitudinal axis parallel to its long side and a transversal axis parallel to its short side, and being arranged coplanar in a 2×2 matrix configuration such that each floor element is adjacent to another element by one of its long sides and adjacent to another of the elements by one of its short sides, the ends of the short sides of the floor elements resting on linear supporting elements, the floor elements comprising in the vertical face of each of the long sides a longitudinal groove having the direction of the longitudinal axis such that a cavity is formed between each pair of adjacent floor elements, the cavities being filled with a grouting, the system including at least one duct extending continuously along the two cavities and a post-tensioned tendon within the duct.
    • 包括至少四个模块化细长预制地板元件的构造系统,每个底板元件限定平行于其长边的纵向轴线和平行于其短边的横向轴线,并且以2×2矩阵构造共面布置,使得每个底板元件 通过其一个长边靠近另一个元件并且通过其短边之一与另一个元件相邻,地板元件的短边的端部搁置在线性支撑元件上,地板元件包括在垂直面 每个长边具有纵向轴线的方向,使得在每对相邻的地板元件之间形成空腔,所述空腔填充有灌浆,所述系统包括沿着两个空腔连续延伸的至少一个管道 和管道内的后张紧肌腱。
    • 10. 发明授权
    • Self-lifting concrete form with platform adapted to accommodate horizontal reinforcing steel
    • US11098490B2
    • 2021-08-24
    • US15598059
    • 2017-05-17
    • Norton Baum
    • Norton Baum
    • E04G11/28E04G17/00E04C5/03E04B5/32E04B5/17
    • A forming system includes a frame and two forming walls. The two forming walls are positioned at a distance from each other to define a first vertical wall course. One forming wall is supported by the frame such that the one forming wall can be translated toward or away from the respective other forming wall. The frame can be raised to raise the two forming walls to be positioned to pour a second vertical course on top of the first vertical course. The translation of the one forming wall allows for the pouring of the first vertical course with horizontally extending rebar that extends through the one forming wall outside of the first vertical wall course, to tie in to a subsequently poured floor slab. The translation permits the vertical raising of the one forming wall, without striking the extending rebar, to pour the second vertical course on the first vertical course. A worker's platform is provided that is supported by the frame and vertically movable by raising the frame. The worker's platform is located below the one forming wall on a side of the one forming wall opposite the respective other forming wall and is rollable or pivotal to also clear the extending rebar during raising of the frame.