会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • INFORMATION PROCESSOR AND RESOURCE SCHEDULING METHOD
    • 信息处理器和资源调度方法
    • US20110145415A1
    • 2011-06-16
    • US12869208
    • 2010-08-26
    • HIROYUKI OSAKIYoko Shiga
    • HIROYUKI OSAKIYoko Shiga
    • G06F15/173
    • G06F9/5072G06F2209/5014
    • The information processor is provided with a receiving unit that receives a request including a period in which the resource is used, a usage status and a cession requirement, a work process storage that stores a pre-cession usage status, a post-cession usage status and a calculating condition, a work time arithmetic expression storage that stores an arithmetic expression of work time, a concession plan preparing unit that determines whether or not it is written to a cession requirement, calculates work time based upon the calculating condition and a specified post-cession usage status and an arithmetic expression, and calculates the capacity of the available resource with which the concession destination user is conceded based upon the calculated work time, the usage period included in the request and the usage period included in the request, and a concession managing unit that makes the resource of the capacity calculated.
    • 信息处理装置设置有接收单元,该接收单元接收包括使用资源的周期的请求,使用状态和接收请求,存储预占用状态的工作处理存储器,保存后使用状态 以及计算条件,存储工作时间的算术表达式的工作时间算术表达式存储器,确定是否将其写入到占有需求的特许计划准备单元,基于计算条件和指定的职位来计算工作时间 根据计算出的工作时间,包含在请求中的使用期限和请求中包含的使用期间,计算特许经营目的地用户所承担的可用资源的容量,以及 特许经营单位,使资源的能力计算。
    • 6. 发明授权
    • Information processor and resource scheduling method
    • 信息处理器和资源调度方法
    • US08396968B2
    • 2013-03-12
    • US12869208
    • 2010-08-26
    • Hiroyuki OsakiYoko Shiga
    • Hiroyuki OsakiYoko Shiga
    • G06F15/16
    • G06F9/5072G06F2209/5014
    • The information processor is provided with a receiving unit that receives a request including a period in which the resource is used, a usage status and a cession requirement, a work process storage that stores a pre-cession usage status, a post-cession usage status and a calculating condition, a work time arithmetic expression storage that stores an arithmetic expression of work time, a concession plan preparing unit that determines whether or not it is written to a cession requirement, calculates work time based upon the calculating condition and a specified post-cession usage status and an arithmetic expression, and calculates the capacity of the available resource with which the concession destination user is conceded based upon the calculated work time, the usage period included in the request and the usage period included in the request, and a concession managing unit that makes the resource of the capacity calculated.
    • 信息处理装置设置有接收单元,该接收单元接收包括使用资源的周期的请求,使用状态和接收请求,存储预占用状态的工作处理存储器,保存后使用状态 以及计算条件,存储工作时间的算术表达式的工作时间算术表达式存储器,确定是否将其写入到占有需求的特许计划准备单元,基于计算条件和指定的职位来计算工作时间 根据计算出的工作时间,包含在请求中的使用期限和请求中包含的使用期间,计算特许经营目的地用户所承担的可用资源的容量,以及 特许经营单位,使资源的能力计算。
    • 8. 发明申请
    • SYSTEM AND METHOD FOR CONTROLLING AIR CONDITIONING FACILITIES, AND SYSTEM AND METHOD FOR POWER MANAGEMENT OF COMPUTER ROOM
    • US20100076608A1
    • 2010-03-25
    • US12544143
    • 2009-08-19
    • Tadakatsu NAKAJIMATakeshi KatoYoko ShigaHitoshi Matsushima
    • Tadakatsu NAKAJIMATakeshi KatoYoko ShigaHitoshi Matsushima
    • G05B15/00
    • G05B19/042G05B2219/25387G05B2219/2614G05B2219/2638
    • The present invention relates to a system and method for controlling air conditioning facilities, and a system and method for power management of a computer room. In an air-conditioning facility control system of a computer room (cooling room) equipped with air-conditioning facilities for air-cooling the computer room in which a large number of information processing units are installed, an air-conditioner monitoring and controlling unit calculates a temperature sensitivity coefficient of each information processing unit, and that of each air conditioner, and then determines discharge air temperature of each air conditioner by use of the temperature sensitivity coefficients in such a manner that the sum of squares of a deviation of a change in discharge air temperature of each information processing unit becomes the smallest, and in such a manner that the sum total of the power consumption of the individual air conditioners becomes the smallest. Moreover, a calorific value of each information processing unit is determined in such a manner that the sum total of the power consumption of the individual air conditioners becomes the smallest. The air-conditioner monitoring and controlling unit instructs each individual air conditioner to adjust the discharge air temperature thereof to the calculated value. Next, the information-processing-unit monitoring and controlling unit assigns a job (load) to each information processing unit on the basis of the calorific value of each information processing unit.This makes it possible to minimize the power consumption of the air-conditioning facilities with cooling air temperature conditions, which are required by each information processing unit disposed in the computer room, satisfied. Moreover, by calculating a ratio of a load placed on each information processing unit, the power consumption of the computer room as a whole can be reduced in cooperation with a monitoring and controlling unit on the information processing unit side.