会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Computing system voltage control
    • 计算系统电压控制
    • US09323301B2
    • 2016-04-26
    • US13773841
    • 2013-02-22
    • International Business Machines Corporation
    • Malcolm S. Allen-WareBishop BrockTilman GloeklerTimothy G. HallettCharles R. LefurgyKarthick RajamaniGuillermo J. SilvaGregory S. Still
    • G06F1/32G06F1/26
    • G06F1/26G06F1/3296Y02D10/172
    • Computing system voltage control methods include receiving an indication of a first performance state. The first performance state is associated with a first voltage and applies to at least one computing system component. The indication of the first performance state is received by a first computing system component from a second computing system component. An indication of a second performance state is received, wherein the second performance state is associated with a second voltage that is not equal to the first voltage. It is determined whether the second performance state is within a range defined by a minimum performance state and a maximum performance state. Responsive to determining that the second performance state is within the range defined by the minimum performance state and the maximum performance state, the voltage of the at least one computing system component is set equal to the voltage associated with the second performance state.
    • 计算系统电压控制方法包括接收第一性能状态的指示。 第一性能状态与第一电压相关联并且应用于至少一个计算系统组件。 由第一计算系统组件从第二计算系统组件接收第一性能状态的指示。 接收第二性能状态的指示,其中第二性能状态与不等于第一电压的第二电压相关联。 确定第二性能状态是否在由最低性能状态和最大性能状态限定的范围内。 响应于确定第二性能状态在由最小性能状态和最大性能状态限定的范围内的情况下,将至少一个计算系统组件的电压设置为等于与第二执行状态相关联的电压。
    • 2. 发明授权
    • Passgate strength calibration techniques for voltage regulators
    • 电压调节器的Passgate强度校准技术
    • US08981829B1
    • 2015-03-17
    • US14458428
    • 2014-08-13
    • International Business Machines Corporation
    • John F. BulzacchelliZeynep Toprak DenizJoshua D. FriedrichTilman GloeklerGregory S. Still
    • H03L5/00G05F1/625
    • G05F1/59G05F1/625
    • Systems and methods are provided to regulate a supply voltage of a load circuit. For example, a system includes a voltage regulator circuit that includes a passgate device. The system includes a passgate strength calibration control module which is configured to (i) obtain information which specifies operating conditions of the voltage regulator circuit, (ii) access entries of one or more look-up tables using the obtained information, (iii) use information within the accessed entries to determine a maximum load current that could be demanded by the load circuit under the operating conditions specified by the obtained information, and to predict a passgate device width which is sufficient to supply the determined maximum load current, and (iv) set an active width of the passgate device according to the predicted passgate device width.
    • 提供系统和方法来调节负载电路的电源电压。 例如,系统包括包括通路装置的电压调节器电路。 该系统包括通道强度校准控制模块,其被配置为(i)获得指定电压调节器电路的操作条件的信息,(ii)使用获得的信息访问一个或多个查找表的访问条目,(iii)使用 在所访问的条目内的信息以确定由所获得的信息指定的操作条件下负载电路可能要求的最大负载电流,并且预测足以提供所确定的最大负载电流的通道装置宽度,以及(iv )根据预测的通道装置宽度设置通道装置的有效宽度。
    • 4. 发明授权
    • Interruption of chip component managing tasks
    • 芯片组件管理任务中断
    • US09372717B2
    • 2016-06-21
    • US14272901
    • 2014-05-08
    • International Business Machines Corporation
    • Bishop BrockTilman GloeklerAndreas KoenigCedric LichtenauPreetham M Lobo
    • G06F9/46G06F9/50G06F9/48
    • G06F9/46G06F9/485G06F9/5038
    • Embodiments include an apparatus comprising a processor and a computer readable storage medium having computer usable program code. The computer usable program code can be configured to determine whether priority of a requested task is higher than a priority of a currently executing task. The computer usable program code can be further configured to determine whether a value indicates that the currently executing task can be interrupted. The computer usable program code can be configured to trigger execution of the requested task on the processor, if the value indicates that the currently executed task can be interrupted. The computer usable program code can be further configured to wait for lapse of a time period and, interrupt the currently executing task upon detection of lapse of the time period or detection of a change to the value, if the value indicates that the currently executing task cannot be interrupted.
    • 实施例包括一种包括处理器和具有计算机可用程序代码的计算机可读存储介质的装置。 可以将计算机可用程序代码配置为确定所请求的任务的优先级是否高于当前执行的任务的优先级。 计算机可用程序代码还可以被配置为确定值是否指示当前执行的任务可被中断。 计算机可用程序代码可被配置为在处理器上触发所请求的任务的执行,如果该值指示当前执行的任务可被中断。 计算机可用程序代码还可被配置为等待时间段的过去,并且如果该值指示当前正在执行的任务,则在检测到时间段的经过或检测到该值的改变时中断当前执行的任务 不能中断
    • 6. 发明申请
    • PASSGATE STRENGTH CALIBRATION TECHNIQUES FOR VOLTAGE REGULATORS
    • 用于电压调节器的优化精度校准技术
    • US20150061744A1
    • 2015-03-05
    • US14458428
    • 2014-08-13
    • International Business Machines Corporation
    • John F. BulzacchelliZeynep Toprak DenizJoshua D. FriedrichTilman GloeklerGregory S. Still
    • G05F1/625
    • G05F1/59G05F1/625
    • Systems and methods are provided to regulate a supply voltage of a load circuit. For example, a system includes a voltage regulator circuit that includes a passgate device. The system includes a passgate strength calibration control module which is configured to (i) obtain information which specifies operating conditions of the voltage regulator circuit, (ii) access entries of one or more look-up tables using the obtained information, (iii) use information within the accessed entries to determine a maximum load current that could be demanded by the load circuit under the operating conditions specified by the obtained information, and to predict a passgate device width which is sufficient to supply the determined maximum load current, and (iv) set an active width of the passgate device according to the predicted passgate device width.
    • 提供系统和方法来调节负载电路的电源电压。 例如,系统包括包括通路装置的电压调节器电路。 该系统包括通道强度校准控制模块,其被配置为(i)获得指定电压调节器电路的操作条件的信息,(ii)使用获得的信息访问一个或多个查找表的访问条目,(iii)使用 在所访问的条目内的信息以确定由所获得的信息指定的操作条件下负载电路可能要求的最大负载电流,并且预测足以提供所确定的最大负载电流的通道装置宽度,以及(iv )根据预测的通道装置宽度设置通道装置的有效宽度。
    • 7. 发明申请
    • INTERRUPTION OF CHIP COMPONENT MANAGING TASKS
    • 芯片组件管理任务中断
    • US20140344824A1
    • 2014-11-20
    • US14302120
    • 2014-06-11
    • International Business Machines Corporation
    • Bishop BrockTilman GloeklerAndreas KoenigCedric LichtenauPreetham M. Lobo
    • G06F9/46
    • G06F9/46G06F9/485G06F9/5038
    • Embodiments include receiving, at a microcontroller of a chip, a request to execute a first task having a first priority. Embodiments further include determining that a second task having a second priority is currently executing. Embodiments further include determining that the first priority is higher than the second priority. Embodiments further include determining whether a value in a register indicates that the second task can be interrupted. If it is determined that the second task can be interrupted, embodiments further include triggering execution of the second task. If it is determined that the second task cannot be interrupted, embodiments further include waiting for lapse of a time period since receipt of the request to execute the first task, and interrupting the second task upon detecting lapse of the time period, or detecting, prior to the lapse of the time period, that the second task can be interrupted.
    • 实施例包括在芯片的微控制器处接收执行具有第一优先级的第一任务的请求。 实施例还包括确定具有第二优先级的第二任务当前正在执行。 实施例还包括确定第一优先级高于第二优先级。 实施例还包括确定寄存器中的值是否指示第二任务可以被中断。 如果确定可以中断第二任务,则实施例还包括触发第二任务的执行。 如果确定第二任务不能被中断,则实施例还包括等待从接收到执行第一任务的请求之后的时间段的过去,以及在检测到时间段的过去时中断第二任务,或者检测先前 到时间段的流逝,第二个任务可以中断。
    • 8. 发明申请
    • COMPUTING SYSTEM VOLTAGE CONTROL
    • 计算系统电压控制
    • US20140149763A1
    • 2014-05-29
    • US13773841
    • 2013-02-22
    • INTERNATIONAL BUSINESS MACHINES CORPORATION
    • Malcolm S. Allen-WareBishop BrockTilman GloeklerTimothy G. HallettCharles R. LefurgyKarthick RajamaniGuillermo J. SilvaGregory S. Still
    • G06F1/32
    • G06F1/26G06F1/3296Y02D10/172
    • Computing system voltage control methods include receiving an indication of a first performance state. The first performance state is associated with a first voltage and applies to at least one computing system component. The indication of the first performance state is received by a first computing system component from a second computing system component. An indication of a second performance state is received, wherein the second performance state is associated with a second voltage that is not equal to the first voltage. It is determined whether the second performance state is within a range defined by a minimum performance state and a maximum performance state. Responsive to determining that the second performance state is within the range defined by the minimum performance state and the maximum performance state, the voltage of the at least one computing system component is set equal to the voltage associated with the second performance state.
    • 计算系统电压控制方法包括接收第一性能状态的指示。 第一性能状态与第一电压相关联并且应用于至少一个计算系统组件。 由第一计算系统组件从第二计算系统组件接收第一性能状态的指示。 接收第二性能状态的指示,其中第二性能状态与不等于第一电压的第二电压相关联。 确定第二性能状态是否在由最低性能状态和最大性能状态限定的范围内。 响应于确定第二性能状态在由最小性能状态和最大性能状态限定的范围内的情况下,将至少一个计算系统组件的电压设置为等于与第二执行状态相关联的电压。