会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明申请
    • POWER MANAGEMENT FOR PROCESSING CAPACITY UPGRADE ON DEMAND
    • 用于处理能力的电力管理需求升级
    • US20120117403A1
    • 2012-05-10
    • US12942475
    • 2010-11-09
    • Andreas BieswangerAndrew J. GeisslerHye-Young McCrearyFreeman L. Rawson, IIIMalcolm S. Ware
    • Andreas BieswangerAndrew J. GeisslerHye-Young McCrearyFreeman L. Rawson, IIIMalcolm S. Ware
    • G06F1/26
    • G06F1/324G06F1/3206Y02D10/126
    • A method, computer program product, and apparatus for managing power in a data processing system are presented. A core is activated in the data processing system and configured to operate at a frequency in response to receiving a request to increase a processing capacity of a set of resources in the data processing system. A determination whether a use of power resulting from activating the core configured to operate at the frequency meets a policy for the use of the power in the data processing system is made. A set of parameters associated with devices in the set of resources are adjusted to meet the policy for the use of power in the data processing system in response to a determination that the use of power does not meet the policy. A determination whether a number of operations performed per unit of time by a set of cores associated with the set of resources increased after activating the core is made. An indication that the request to increase the processing capacity of the set of resources is unavailable is made in response to a determination that the number of operations performed per unit of time by the set of cores associated with the set of resources has not increased.
    • 提出了一种在数据处理系统中管理电源的方法,计算机程序产品和装置。 核心在数据处理系统中被激活并且被配置为响应于接收到增加数据处理系统中的一组资源的处理能力的请求而以频率操作。 确定是否使用由配置为在频率上操作的核心而产生的功率满足在数据处理系统中使用电力的策略。 调整与资源集合中的设备相关联的一组参数以响应于确定使用电力不符合策略的数据处理系统中的电力使用策略。 确定在激活核心之后,通过与资源集相关联的一组核心,每单位时间执行的操作数量是否增加。 响应于通过与该资源集相关联的一组核心单位时间执行的操作数量没有增加来确定增加资源集合的处理能力的请求不可用的指示。