会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Instantaneous phasor determination for poly-phase electrical grids
    • 多相电网的瞬时相量测定
    • US08532230B2
    • 2013-09-10
    • US13222142
    • 2011-08-31
    • Jeffrey D. Taft
    • Jeffrey D. Taft
    • H04L27/06
    • G01R19/2513Y02E60/728Y04S10/265
    • In one embodiment, three substantially simultaneous phase waveforms may be converted into a first quadrature signal and a zero sequence signal. For each phase waveform, a power system digital frequency may be determined through analysis of the first quadrature signal (e.g., and at least one additional prior quadrature signal) while eliminating waveform phase angles from the analysis. Subsequently, demodulation of the first quadrature signal and zero sequence signal based on the power system digital frequency results in a positive sequence phasor, a negative sequence phasor, and a zero sequence phasor.
    • 在一个实施例中,三个基本上同时的相位波形可以被转换成第一正交信号和零序信号。 对于每个相位波形,可以通过分析第一正交信号(例如和至少一个附加的先前正交信号)来确定电力系统数字频率,同时消除来自分析的波形相位角。 随后,基于电力系统数字频率的第一正交信号和零序信号的解调产生正序相量,负序相量和零序相量。
    • 9. 发明授权
    • Distribution system analysis using meter data
    • 配电系统分析采用仪表数据
    • US08386200B2
    • 2013-02-26
    • US13334504
    • 2011-12-22
    • Jeffrey D. Taft
    • Jeffrey D. Taft
    • G06F19/00
    • G01R21/1331G01R19/2513Y02E60/728Y04S10/265
    • A monitoring system includes a first sensor positioned at a first location along a phase conductor line and a second sensor position at a second location along the phase conductor line. The first sensor is configured to generate a first set of synchrophasor data. The second sensor is configured to generate a second set of synchrophasor data. The monitoring system includes a processor configured to receive the first and second sets of synchrophasor data. The processor is further configured to determine a primary side voltage of at least one distribution transformer electrically connected to the phase conductor line based on a secondary side voltage of the at least one distribution transformer. The processor is further configured to determine at least one phase conductor line condition based on the first and second sets of synchrophasor data and the primary side voltage.
    • 监测系统包括位于沿着相导线的第一位置处的第一传感器和沿着相导线的第二位置处的第二传感器位置。 第一传感器被配置为生成第一组同步信息数据。 第二传感器被配置为生成第二组同步信息数据。 监视系统包括被配置为接收第一组和第二组同步信息数据的处理器。 处理器还被配置为基于至少一个配电变压器的次级侧电压来确定电连接到相导线的至少一个配电变压器的初级侧电压。 处理器还被配置为基于第一组和第二组同步信号数据和初级侧电压来确定至少一个相导线条件。